TM 5-3800-205-10-1
AIR TRANSPORT BY C-130 AIRCRAFT - CONTINUED
0018 00
RETURN MACHINE TO OPERATIONAL CONFIGURATION - CONTINUED
5.
Remove one short (6 5/8 in.) steering cylinder locking collar from each steering cylinder and set aside for stowage in
ISU-60 container:
a.
Remove two bolts and washers, and remove one short (6 5/8 in.) locking collar and hose wrapping from each steer-
ing cylinder.
b.
Reassemble each locking collar assembly with its mounting hardware.
SHORT LOCKING COLLAR
TWO BOLTS
AND WASHERS
HOSE
WRAPPING
390-1033
6.
Install turnbuckles and raise cutting edge wheels and load transfer axle wheels off ground:
a.
Install one end of each turnbuckle to lug on scraper bowl. Secure with pin and cotter pin.
0018 00-37