TM 5-3805-248-23-2
PREPARATION FOR STORAGE OR SHIPMENT - CONTINUED
0333 00
PREPARATION FOR RETURN TO SERVICE FROM LONG-TERM STORAGE - CONTINUED
6.
Check coolant level in radiator (TM 5-3805-248-10).
7.
Install fully charged batteries (WP 0103 00).
8.
Tighten or install drive belts (WP 0053 00 and WP 0056 00).
9.
Remove seals from all engine openings, including air intake, exhaust outlet and crankcase breather tube.
10.
Start engine and perform machine warmup (TM 5-3805-248-10). Verify proper operation of all gages, switches and
lights.
11.
Operate machine without a load and check engine, transmission, brakes, steering and electrical accessories for proper
operation (TM 5-3805-248-10).
PREPARATION FOR SHIPMENT
1.
Perform Operator Preventive Maintenance Checks and Services (PMCS) (TM 5-3805-248-10).
2.
Perform Unit Maintenance Preventive Maintenance Checks and Services (PMCS) (WP 0019 00 and WP 0020 00).
3.
Schedule the next PMCS on DD Form 814, Preventive Maintenance Schedule and Record.
4.
Seal exhaust stack opening and engine air cleaner precleaner opening with tape.
5.
Consult shipping and transportation data on data plate (TM 5-3805-248-10).
END OF WORK PACKAGE
0333 00-3/-4 Blank