CHAPTER 1. INTRODUCTION - MWO-5-2350-262-35-20005
TECHNICAL PUBLICATIONS AFFECTED/CHANGED.
QUALITY ASSURANCE REQUIREMENTS.
CHAPTER 2. CREW COOLING SYSTEM INSTALLATION
Table 2-2. Microclimate Cooling Unit Parts List.
Vehicle Preparation
Figure 2-2. Locating and Drilling Fourth Hole for MCU Mounting Bracket Installation.
Figure 2-3. Drilling, Tapping and Installing Steel Insert in Fourth Mounting Hole.
Figure 2-4. Assembly of MCU Base and Support Bracket.
Figure 2-5. MCU Installation on Base and Support Bracket Assembly
Figure 2-7. Removal of MCS Preparation Kit Brackets
Figure 2-9. MCU Coolant Umbilical BCA Installation.
Circuit Breaker Installation in Driver's Compartment
Figure 2-11. CCS Circuit Breaker Installation.
Figure 2-14. MCU Power Lead Routing from Driver's Compartment to Engine Terminal.
Figure 2-15. MCU Power Lead Connection at Engine Terminal
Figure 2-17. Coolant Umbilical and Electrical Connections to MCU.
Figure 2-18. Installing MCU Ground Wire Connection.
Figure 2-19. MCU Access Cover Installation.
SECTION IV SYSTEM CHARGING & PURGING PROCEDURES
Figure 2-23. Charge/Purge Kit for Charging MCG.
Purging MCG
Figure 2-26. Latch Tether for Purging MCG.
Charging Microclimate Cooling Unit (MCU)
Figure 2-29. Charge/Purge Kit for MCU.
Figure 2-31. Charge/Purge Kit for Purging MCU.
Figure 2-32. Release Tether for Purging MCU.
CHAPTER 3. CREW COOLING SYSTEM INSTALLATION FOR FORCE XXI BATTLE COMMAND-BRIGADE AND BELOW (FBCB2) EQUIPPED VEHICLES ONLY
Figure 3-1. Left Seatbelt Bracket.
Figure 3-2. New Installation Holes.
MWO-5-2350-262-35-2 Modification of Armored Combat Earthmover (ACE) M9 System Improvement Plan (SIP) Phase 4 Block Modification Manual