TM 5-3800-205-10-1
EXTERNAL AIR TRANSPORT BY CH-47 HELICOPTER - CONTINUED
0017 00
TOOLS AND EQUIPMENT - CONTINUED
3.
Components of the machine that must be removed in preparation for external air transport are stowed in the con-
tainer, for subsequent transport to the assembly site.
4.
Reinstall mounting hardware for all removed components on machine, to secure against loss during transport.
SUMMARY OF PROCEDURES
NOTE
The following summary of procedures is provided to assist personnel preparing the machine for external
air transport by CH-47 helicopter.
1.
Disassemble and sectionalize machine:
a.
Determine disassembly required per CH-47 mission flight profile.
b.
Remove windshield wiper arm and windshield.
c.
Remove ROPS/FOPS.
d.
Remove guard plates.
e.
Remove engine grille.
f.
Install scraper bowl cutting edge wheels.
g.
Install front and rear stability skids.
h.
Disconnect bowl lift cylinders from draft frame and lower to ground.
i.
Install hitch locking blocks.
j.
Install all steering locks.
k.
Install auxiliary fuel tank and connect fuel lines.
l.
Disconnect electrical, hydraulic, air, and fuel lines between tractor and scraper.
m.
Disconnect draft arms from scraper bowl.
n.
Remove exhaust stack and install exhaust extension.
o.
Remove tractor fenders.
p.
Remove upper handrail with side mirror.
q.
Drive tractor away from scraper bowl.
r.
Raise bowl lift cylinders and secure.
s.
Stow tools in scraper BII toolbox and secure.
t.
Pack ISU-60 container.
0017 00-2