TM 5-3800-205-23-1
SLAVE START RECEPTACLE AND CABLES REPLACEMENT - CONTINUED
0068 00
REMOVAL - CONTINUED
3.
Remove protective boots (3) from terminals (7 and 8).
NOTE
Tag all cables to aid in installation.
4.
Remove screw (4), lockwasher (5), and negative cable (6) from terminal (7). Discard lockwasher.
5.
Remove other screw (4), lockwasher (5) and positive cable (9) from terminal (8). Discard lockwasher.
3
4,5,6
8
4,5,9
7
6.
Remove four screws (10), washers (11), locknuts (12), and cover strap (13) from slave start receptacle (2). Discard lock-
nuts.
7.
With assistance, pull slave start receptacle (2) from bulkhead (14).
2
10,11,12
14
13
0068 00-2