TM 5-3805-248-23-2
OPERATOR COMPARTMENT REPLACEMENT - CONTINUED
0315 00
INSTALLATION - CONTINUED
70.
Install dash panel circuit breakers (WP 0070 00).
71.
Install worklight, high beam, low beam and backup alarm relays (WP 0078 00).
72.
Install headlamp dimmer switch (WP 0079 00).
73.
Install turn signal flasher (WP 0081 00).
74.
Install backup alarm (WP 0100 00).
75.
Install operator compartment wiring harness (WP 0106 00).
76.
Install transmission shift control cable (WP 0125 00).
77.
Install transmission shift control lever and housing (WP 0126 00).
78.
Install brake retarder air lines (WP 0141 00).
79.
Install brake hoses and fittings (WP 0162 00, WP 0163 00, WP 0169 00).
80.
Install brake control valve (WP 0155 00).
81.
Install double check valve (WP 0158 00).
82.
Install brake control valve lines and fittings (WP 0161 00).
83.
Install air dryer (WP 0152 00).
84.
Install tractor air tanks (WP 0153 00).
85.
Install steering column and shaft (WP 0178 00).
86.
Install mechanical linkage (WP 0179 00).
87.
Install rollover protection system (ROPS) (WP 0203 00).
88.
Install operator compartment-upper front access plates (WP 0192 00).
89.
Install operator compartment-side panel plate (WP 0195 00).
90.
Install floormat and step (WP 0198 00).
91.
Install left fender (WP 0205 00).
92.
Install seat assembly (WP 0211 00).
93.
Install air horn assembly (WP 0218 00).
94.
95.
Install non-electrical gages lines and fittings (WP 0249 00, WP 0250 00).
96.
97.
Install battery disconnect switch (WP 0074 00).
98.
Install transmission shift pedal (WP 0139 00).
99.
Install transmission shift lines and fittings (WP 0248 00).
100. Install transmission shift control valve (WP 0174 00).
101. Install differential lock pedal (WP 0171 00).
102. Install differential lock lines and fittings (WP 0172 00).
103. Install differential lock control valve assembly (WP 0173 00).
104. Install scraper hydraulic controls, levers and linkage (WP 0222 00).
105. Operate machine and verify machine, accessories and controls operate correctly (TM 5-3805-248-10).
END OF WORK PACKAGE
0315 00-16