TM 5-3805-260-24
INSTALL LOAD TRANSFER CYLINDER
NOTE: Attach hoist to cylinder before installing bolts (1),
washers (2) and cap (3).
1.
Replace bearings and hoist cylinder into position.
Replace cap (3), four washers (2) and bolts (1).
Tighten bolts and remove hoist.
2.
Remove jumper hose from fitting under walkway
and from dump and lift valve.
3.
Connect two hoses; one to the dump and lift
valve, and one to the fitting under the walk plate
near the right front fender.
4.
Start the engine, extend the cylinders, and stop
the engine. Connect the load transfer axle
cylinder eyes to the lugs on the axle.
3-357