• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNFOLDING DOZER BLADE - Continued
TRACK TENSION ADJUSTMENT

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  18    19    20    21    22  23  24    25    26    27    28  
img
.
TM 5-2350-377-13&P
0006
UNFOLDING DOZER BLADE - Continued
5.
Install two dozer blade lockpins (Figure 4, Item 2) and two clips (Figure 4, Item 3).
6.
Install blade latch (Figure 4, Item 1), facing rearward, with pin assembly (Figure 4, Item 5) on each side of
apron (Figure 4, Item 4).
3
2
1
4
5
4
O0008HBF
Figure 4. Unfolding Dozer Blade.
END OF TASK
END OF WORK PACKAGE
0006-4
03/15/2011Rel(1.8)root(opusualwp)wpno(O00003)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.