• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SPECIFIC PMCS PROCEDURES
CHAPTER 6 MAINTENANCE INSTRUCTIONS

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  70    71    72    73    74  75  76    77    78    79    80  
img
. . . .
TM 5-2350-377-13&P
0020
FIELD MAINTENANCE
FIELD PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
INITIAL SETUP:
Personnel Required
References
Construction Equipment Repairer, 91L
WP 0018
Table 1. Field Preventive Maintenance Checks and Services (PMCS).
ITEM TO BE
EQUIPMENT
CHECKED OR
NOT READY/
ITEM
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
NO.
NOTE
Perform Operator PMCS (WP 0018) prior to
or along with Field PMCS.
1
Semi-
Track Adjusting
Check cylinders for cracks, leaks, and loose or missing Class III leaks, or
annually
Cylinders
hardware.
damaged.
2
Semi-
Track Adjusting
Check manifold assembly for cracks, leaks, or loose or
Class III leaks, or
annually
Hydraulic
missing hardware.
damaged.
Manifold
PMCS MANDATORY REPLACEMENT PARTS
There are no mandatory replacement parts for these PMCS procedures.
END OF TASK
END OF WORK PACKAGE
0020-1/2 blank
03/15/2011Rel(1.8)root(pmcswp)wpno(I00004)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.