TM 5-3800-205-10-1
RAIL TRANSPORT - CONTINUED
0021 00
RETURN MACHINE TO OPERATIONAL CONFIGURATION - CONTINUED
d.
pry bar and torque wrench; and
e.
ladder.
CENTER POST
LOAD TRANSFER RELIEF VALVE
PRY BAR AND
RETAINER
AND HOSE ASSEMBLY
TORQUE WRENCH
LADDER
390-1118
CONTAINER CENTER POST
Table 7. Stowage Instructions for ISU-60 Container - Two-Door End.
COMPONENT
STOWAGE INSTRUCTIONS
1.
Place each component in cushion pad on shelf, against back wall of container.
Wrench
2.
Secure with three straps.
Ladder
1.
Place ladder on shelf with top of ladder facing right.
2.
Ensure load transfer relief valve and hose assembly is positioned on top of ladder.
3.
Secure components with three straps.
Container Center Post
1.
Position center post, installing bottom end first.
2.
Raise shelf slightly to lock center post in position.
3.
Install center post retainer and tighten.
CAUTION
Check to ensure all components are securely fastened prior to closing and
securing door. Failure to do so may result in damage to equipment.
END OF WORK PACKAGE
0021 00-47