TM 5-3805-248-23-2
SHIFT PRESSURE VALVE REPAIR
THIS WORK PACKAGE COVERS
Disassembly, Cleaning, Inspection, Assembly
INITIAL SETUP
Materials/Parts - Continued
Maintenance Level
Direct Support
Tools and Special Tools
Tool kit, general mechanic's (Item 113, WP 0338
Packing, preformed (3)
Equipment Condition
Materials/Parts
CAUTION
Exercise care when handling transmission control valve assemblies and parts. Do not nick, scratch or scrape
valve bodies or spools. Failure to follow this procedure could result in damage to equipment.
DISASSEMBLY
NOTE
If service of the shift pressure valve is limited to adding or taking out spacers, it is only necessary to com-
plete steps 1 and 10 of disassembly and steps 12 and 24 of assembly.
1.
Remove three bolts (1), washers (2) and cover assembly from valve body (3).
1
2
COVER
ASSEMBLY
3
394-848