TM 5-3805-260-10
(1)
Connecting bowl lift cylinders at the bottom and raising the elevator mechanism. See Drive Off Procedures,
Preparation For Operation (page 1-57).
(2)
Removal of load transfer equipment (load transfer axle and jacks, and cutting edge bad transfer wheels).
See Drive Off Procedures, Removing Load Transfer Equipment (page 1-59).
(3)
Installation of cutting edge teeth, if equipped.
(4)
Installation of elevator rock guard. Contact Organizational maintenance.
(5)
Installation of rollover protective structure (ROPS) with windshield. Contact Organizational maintenance.
DRIVE ON PROCEDURES
a.
Personnel and Tools Required. Drive on make-ready can be accomplished by two people in two (2) hours. A
third person could expedite some of the procedures.
Refer to Table A for a listing of drive on equipment.
The following standard hand tools are required for drive on and are stored in the tool box:
Combination box and open end wrenches in 1/2, 9/16, 3/4, 15/16, 1-1/8, and 1-1/2 in. sizes
Wrench sockets with 1/2 in. drive in 1/2, 9/16, 3/4, 15/16, 1-1/8, and 1-1/2 in. sizes.
Ratchet wrench with 1/2 in. drive
Socket wrench extension with 1/2 in. drive by 5 in. long
1-46