TM 5-3805-260-10
(8)
Install a load transfer wheel on each end
of the cutting edge. Tighten retaining
screw.
(9)
Raise the bowl and remove the block from
under the cutting edge, close the bowl
floor and lower the bowl until the wheels
are on the ground. Stop the engine.
c.
Preparation (Drive On). Sixteen procedures are necessary to ready the Tractor-Scraper for drive on.
(1)
Fold down steps on both sides of the bowl.
(2)
Clean any dirt from elevator hanger arms,
ejector links and side pockets of bowl.
1-50