TM 5-3805-260-10(11) Attach the lower end of the retractor links(access from steps on side of bowl)(12) Fold up steps on both sides of the bowl.c.RemovingLoadTransferEquipment. Nine procedures are necessary to remove load transfer equipment.(1)Start the engine, raise the bowl about onefoot and open the bowl floor about sixinches. Place a block under the cuttingedge to keep the load transfer wheels offthe ground. Lower the load transfer axle.Stop the engine.1-59
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business