TYPICAL DISCHARGE PATTERN WITH VERTICAL DISTORTION (RECONDITIONING OR REPLACEMENTNECESSARY)VI. Cap Leakage Test1.move fuel injection nozzle (I) from the P4150 Nozzle Tester and put it in 8S2250 Nozzle Holding Tool (P).NOZZLE CAP INSTALLATION1.Fuel injection nozzle4. Cap. 7. 1H1023 O-ring seal.2. Install new IH1023 O-ring Seal (7). 3. Install cap (4) and tighten to 110 to 120 lb. in. (12.4 to 13.6 N.m).TIGHTENING CAP8. 9S5031 Socket.P. 8S2250 Nozzle Holding Tool.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business