TM 5-3800-205-10-1
RAIL TRANSPORT - CONTINUED
0021 00
SUMMARY OF PROCEDURES--RAIL TRANSPORT (OCONUS)
NOTE
The following summary of procedures is provided to assist personnel preparing the machine for OCONUS
rail transport.
1.
Configure machine for rail transport:
a.
Remove windshield wiper arm and windshield.
b.
Remove ROPS/FOPS.
c.
Configure elevator for rail transport.
d.
Remove exhaust stack and install exhaust extension.
e.
Remove upper handrail with side mirror.
2.
Load machine onto flatcar.
3.
Secure machine on flatcar:
a.
Install all steering locks.
b.
Provide blocking, shoring, wind protection safeguards, and vandalism protection. Tie down machine.
c.
Pack ISU-60 container and load on flatcar. Tie down container.
4.
The following illustration shows the scraper configured for OCONUS rail transport.
OCONUS RAIL
390-2051
0021 00-3