TM 5-3800-205-23-1
UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - CONTINUED
0010 00
Table 1. Unit Preventive Maintenance Checks and
Services (PMCS) for 613CS Scraper - Continued.
LOCATION
ITEM TO
ITEM
MAN-
CHECK/
NOT FULLY MISSION
NO.
INTERVAL
HOURS
SERVICE
PROCEDURE
CAPABLE IF:
a. Check clearance of two ejector sup-
26
2000 Hours
Ejector Sup-
port (rear) rollers at rear of ejector:
or Annual
port (Rear)
Rollers
(1) Move ejector all the way for-
ward. With ejector forward,
support rollers will be accessi-
ble inboard from rear tires.
(2) Measure clearance between
support roller and track on each
side of ejector frame. Clearance
should be 0.032-0.190 in. (0.80-
4.80 mm).
c. Check for wear or damage to sup-
port (rear) rollers.
d. If clearance is not as specified, or if
ejector support (rear) rollers are
worn or damaged, remove, clean,
inspect, and pack with grease or
replace rollers (TM 5-3800-205-23-
2).
EJECTOR
SUPPORT
TRACK
(REAR)
ROLLER
0010 00-28