TM 5-3800-205-23-1
UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - CONTINUED
0010 00
Table 1. Unit Preventive Maintenance Checks and
Services (PMCS) for 613CS Scraper - Continued.
LOCATION
ITEM TO
ITEM
MAN-
CHECK/
NOT FULLY MISSION
NO.
INTERVAL
HOURS
SERVICE
PROCEDURE
CAPABLE IF:
NOTE
27
2000 Hours
0.5 Hours Elevator
or Annual
Speed
Refill capacity of elevator speed reducer is 10.6 qt (10 l).
Reducer
Change oil in elevator speed reducer:
a. Clean area around filler, level, and
drain plugs with a clean rag (Item
b. Remove drain plug and allow oil to
drain into a suitable container. Dis-
pose of oil in accordance with local
policy and ordinances.
DRAIN
PLUG
390-1144
0010 00-29