TM 5-3805-248-23-1
HITCH TO DRAFT FRAME INTERMEDIATE HOSES,
LINES AND FITTINGS REPLACEMENT - CONTINUED
0235 00
INSTALLATION
1.
Install new preformed packing (9) on hose assembly (1).
2.
Install and two flange halves (8) on hose assembly (1)
3.
Install four washers (7) and capscrews (6) on hose assembly (1).
8,9 (HIDDEN)
6,7
1
394-546
4.
Install new preformed packing (5) on hose assembly (1).
5.
Connect hose assembly (1) to draft frame and install two flange halves (4).
6.
Install four washers (3) and capscrews (2) on hose assembly (1).
1
4,5 (HIDDEN)
2,3
394-545
7.
Fill hydraulic tank to correct level (TM 5-3805-248-10).
0235 00-4