PUSH RODS AND ARMS REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation, Valve Lash Adjustment
INITIAL SETUP
Materials/Parts - Continued
Maintenance Level
Direct Support
Tools and Special Tools
Tool kit, general mechanic's (Item 113, WP 0338
References
TM 5-3805-248-10
Shop equipment, field maintenance (Item 104, WP
Equipment Condition
Fuel injection lines removed (WP 0030 00)
Materials/Parts
Valve covers removed (WP 0021 00)
Hood removed (WP 0189 00)
REMOVAL
NOTE
The following is a maintenance procedure for front bank push rods. The maintenance procedure for the rear
bank push rods is identical.
1.
Remove three bolts (3) and washers (2).
2.
Remove rocker shaft assembly (1) from cylinder head.
NOTE
3
1
Each push rod must be numbered during
2
1
removal so push rods can be installed in
the same location.
3.
Use tags to number six push rods (4) and remove.