• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 18. Cutting Edges Assembly.
Figure 20. Alignment of Apron and Dozer Assembly.

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  130    131    132    133    134  135  136    137    138    139    140  
img
.
TM 5-2350-377-13&P
0036
ASSEMBLY - Continued
13.
Assemble extensions:
NOTE
New production vehicles are equipped with a steel dozer blade and dozer blade
extension. Go to Step (c) for steel dozer blade extensions.
a.
Align dowels (Figure 19, Item 2) with holes in each side of apron and dozer assembly
(Figure 19, Item 1). Seat apron extensions (Figure 19, Item 3) and dozer extensions (Figure 19, Item 4)
with hammer and wood block.
1
2
3
4
2
M0037HBF
Figure 19. Apron and Dozer Extensions Assembly.
0036-18
03/15/2011Rel(1.8)root(maintwp)wpno(M00009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.