TM 5-2350-377-13&P
0036
ASSEMBLY - Continued
8.
Coat short threaded end of two studs (Figure 17, Item 5) with sealing compound, and install washer
(Figure 17, Item 3) and nut (Figure 17, Item 4) on each stud (Figure 17, Item 5).
9.
Install lift eye shackle (Figure 17, Item 2) on each side of apron (Figure 17, Item 1) with studs
(Figure 17, Item 5) from outboard side of bracket.
10.
Coat long threaded end of two studs (Figure 17, Item 5) with engine lubricating oil and install washer
(Figure 17, Item 6) and new locknut (Figure 17, Item 7) on each stud (Figure 17, Item 5). Tighten locknuts
(Figure 17, Item 7) to 83-91 lb-ft (113-123 Nm).
1
2
3
4
7
6
5
M0035HBF
Figure 17. Installation of Studs onto Apron Assembly.
NOTE
Refer to the following pages and install the components and assemblies on the apron and
dozer assembly.
11.
12.
Assemble cutting edges:
NOTE
Coat threads of screws with lubricating oil prior to installation.
a.
Install dozer extension end bit (Figure 18, Item 5) on dozer extension (Figure 18, Item 2) with four screws
(Figure 18, Item 11), washers (Figure 18, Item 3), and new locknuts (Figure 18, Item 4).
b.
Install dozer cutting edge (Figure 18, Item 13) on dozer blade (Figure 18, Item 1) with screw
(Figure 18, Item 12), washer (Figure 18, Item 10), and new locknut (Figure 18, Item 9) on each end.
c.
Fold dozer blade (Figure 18, Item 1).
d.
Install sixteen screws (Figure 18, Item 8), washers (Figure 18, Item 7), and new locknuts
(Figure 18, Item 6) on dozer cutting edge (Figure 18, Item 13) and dozer blade (Figure 18, Item 1).
e.
Tighten locknuts (Figure 18, Items 4, 6, and 9) to 280 lb-ft (379 Nm).