TM 5-3800-205-10-1
Table 1. Preventive Maintenance Checks and
Services (PMCS) for 613CS Scraper - Continued.
LOCATION
ITEM TO
CHECK/
ITEM
MAN-
NOT FULLY MISSION
SERVICE
NO.
INTERVAL
HOURS
PROCEDURE
CAPABLE IF:
74
After
0.5 Hours Hitch and
c. Apply GAA grease (Item 10, WP
(Con't)
Steering
Linkage
ing grease fittings.
d. Apply GAA grease (Item 10, WP
grease fittings.
GAA (STEERING)
GAA (HITCH)
GAA
(STEERING)
GAA
(HITCH)
390-984
GAA (STEERING)
NOTE
75
After
0.5 Hours Elevator
Assembly
Park machine on level ground, with parking brake applied
and bowl lowered to the ground.
Obtain appropriate measuring device from Unit Mainte-
nance, to measure elevator chain slack in step a.
0014 00-53