TM 5-3800-205-10-1
Table 1. Preventive Maintenance Checks and
Services (PMCS) for 613CS Scraper - Continued.
LOCATION
ITEM TO
ITEM
MAN-
CHECK/
NOT FULLY MISSION
NO.
INTERVAL
HOURS
SERVICE
PROCEDURE
CAPABLE IF:
75
After
0.5 Hours Elevator
a. Inspect elevator chain for correct
(Con't)
Assembly
slack. Take measurement approxi-
mately half way between upper
sprocket and lower idler, at widest
space between edge of elevator
frame and upper side of chain.
Chain slack must be 5-9 in. (127-
229 mm). Notify Unit Maintenance
if adjustment is required.
5-9 IN.
(127-229 MM)
b. Apply GAA grease (Item 10, WP
chain adjustment idler, on each side
of elevator frame.
GAA
0014 00-54