TM 5-3800-205-10-1
EXTERNAL AIR TRANSPORT BY CH-47 HELICOPTER - CONTINUED
0017 00
MACHINE ASSEMBLY - CONTINUED
Table 8. Stowage Instructions for ISU-60 Container - Two-Door End.
COMPONENT
STOWAGE INSTRUCTIONS
1.
Place each component in cushion pad on shelf, against back wall of container.
Wrench
2.
Secure components with three straps.
Front Stability Skid
1.
Place front stability skid in left rear corner on floor, with "foot" of skid facing back
wall. Leg of skid rests in U-shaped channel of support post.
2.
Secure leg of skid to support post with one strap.
Front Stability Skid
1.
Place braces in cushion pad on left side of floor.
Braces
2.
Secure with two straps.
Rear Stability Skid
1.
Place in front of front stability skid, with "foot" facing out.
2.
Orient rear stability skid so that mounting leg with cutout is aligned with base of
mounting post.
3.
Secure leg to base of mounting post with two pins.
4.
Secure legs of front and rear stability skids together with one strap.
Cutting Edge Wheels
1.
Place two straps through loops on floor, on right side of container.
2.
Place one cutting edge wheel on its side with wheel facing left.
3.
Place other cutting edge wheel in front of first, with wheel facing right.
4.
Place H-shaped bracket on top and pass two straps through bracket.
5.
Tighten straps.
Container Center Post
1.
Position center post, installing bottom end first.
2.
Raise shelf slightly to lock center post in position.
3.
Install center post retainer and tighten.
CAUTION
Check to ensure all components are securely fastened prior to closing and
securing door. Failure to do so may result in damage to equipment.
END OF WORK PACKAGE
0017 00-65