TM 5-3800-205-23-1
NEUTRAL START SWITCHES REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Equipment Condition
Maintenance Level
Machine parked on hard, level surface (TM 5-3800-
Unit
205-10-1 or TM 5-3800-205-10-2)
Tools and Special Tools
Scraper bowl or water tank lowered to ground (TM
5-3800-205-10-1 or TM 5-3800-205-10-2)
Tool kit, general mechanic's (Item 33, WP 0172
Parking brake applied (TM 5-3800-205-10-1 or TM
5-3800-205-10-2)
Wheels chocked (TM 5-3800-205-10-1 or TM 5-
Materials/Parts
3800-205-10-2)
Battery disconnect switch in OFF position (TM 5-
Pin, spring (3)
3800-205-10-1 or TM 5-3800-205-10-2)
REMOVAL
1.
Remove spring pin (1) and neutral lock lever (2) from panel (11). Discard spring pin.
2.
Remove spring pin (3), parking brake handle (4), and nut (12) from valve (13). Discard spring pin.
3.
Remove spring pin (5), emergency brake handle (6), and nut (10) from valve (7). Discard spring pin.
4.
Remove four screws (8) and washers (9) from panel (11).
NOTE
Panel does not have to be completely removed to access neutral start switches.
5.
Slide panel (11) up transmission shift lever (14) and turn panel to left.
3
4
6
5
7
2
8,9
1
10
14
12
11
13