TM 5-3800-205-23-2
ELEVATOR CHAIN ROLLER MAINTENANCE - CONTINUED
0035 00
INSTALLATION - CONTINUED
NOTE
To determine correct amount of shims needed, subtract distance by 0.06 in. (1.5 mm).
9.
Measure end play of roller (8):
4
8
a.
Push roller (8) against elevator (4).
b.
Place straight edge on elevator (4) and against
roller (8).
c.
Push roller against hub (3) and measure distance.
d.
Subtract measurement from 0.06 in. (1.5 mm) to
determine number of shims required.
10.
Remove hub (3) from elevator (4).
390-803
3
11.
Install number of shims (5) required (determined in step 9) on shaft (6).
12.
Install key (7) on shaft (6).
13.
Install hub (3) on elevator (4).
14.
Install plate (2) on hub (3) with three bolts (1). Use a hammer and wood block to seat hub on roller and tighten bolts to
100 lb-ft (135 Nm).
1
5
390-793
390-795
7
2
6
3
15.
END OF WORK PACKAGE
0035 00-6