TM 5-3805-248-10
MARINE TRANSPORT--ROLL-ON/ROLL-OFF (RO/RO) PROCEDURES - CONTINUED
0018 00
RO/RO LOAD PROCEDURE - CONTINUED
3.
Raise or lower scraper bowl as required to clear the crest of ramps.
4.
After loading, park machine where directed to do so:
a.
Place transmission in N (Neutral) and lock.
b.
Apply parking brake.
c.
Move ejector all the way to the rear and close apron.
d.
Lower bowl and position cutting edge onto suitable shoring.
e.
Shut down engine and secure machine against vandalism.
f.
Fold left side mirror inward.
5.
Provide assistance, as required, to ship crew in blocking/shoring/lashing machine for transport.
RO/RO UNLOAD PROCEDURE
1.
Provide assistance, as required, to ship crew in removing blocking/shoring/lashing on machine.
2.
Adjust rearview and side mirrors as necessary.
3.
Follow ground guide instructions when moving about the ship.
4.
Negotiate ramps in 1st gear ONLY.
5.
Raise or lower scraper bowl as required to clear the crest of ramps.
6.
After unloading, park machine where directed to do so:
a.
Place transmission in N (Neutral) and lock.
b.
Apply parking brake.
c.
Move ejector all the way to the rear and close apron.
d.
Lower bowl and shut down engine.
e.
Secure machine against vandalism.
END OF WORK PACKAGE
0018 00-2