TM 5-3805-248-23-1
UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - CONTINUED
0020 00
Table 1. Unit Preventive Maintenance Checks and Services (PMCS) for 621B Scraper - Continued.
LOCATION
ITEM TO
ITEM
MAN-
CHECK/
NOT FULLY MISSION
NO.
INTERVAL
HOURS
SERVICE
PROCEDURE
CAPABLE IF:
30
2000 Hours
Ejector
or Annually
Guide Roll-
a. Remove four bolts (11) and cap (10)
ers
from the roller (17).
b. Remove the nut (12), lock (13) and
washer (14) from the shaft (15).
Discard lock.
c. Remove the upper bearing (16)
from the shaft (15).
grease. Pack the upper bearing (16)
with grease.
e. Install upper bearing (16), washer
(14), new lock (13) and nut (12) on
shaft (15).
f. Tighten nut (12) until roller (17)
locks. Then back nut off 1/6 of a
turn. Roller should turn freely with-
out end play.
g. Crimp the new lock (13) against the
nut.
h. Pack cap (10) with grease and
install cap and four bolts (11).
10
11
12,13,14,
15,16 (HIDDEN)
17
394-1540
0020 00-10