TM 5-3805-248-23-1
COOLANT TEMPERATURE GAGE AND CONVERTER/RETARDER
TEMPERATURE GAGE REPLACEMENT - CONTINUED
0058 00
INSTALLATION
1.
Install new seal (7) and coolant temperature gage (6) in instrument panel.
2.
Install bracket (8) on posts of coolant temperature gage (6).
3.
Install new lockwasher (2) and nut (1).
4.
Install new lockwasher (10) and nut (9).
5.
Connect wire connector (5) at terminal.
6.
Install new lockwasher (4) and nut (3).
7.
Connect wire connector (13) at terminal.
8.
Install new lockwasher (12) and nut (11).
9.
Connect wire connector (16) at terminal.
10.
Install new lockwasher (15) and nut (14).
11.
12.
13.
Operate machine and verify gage operates correctly (TM 5-3805-248-10).
END OF WORK PACKAGE
0058 00-3/(-4 blank)