TM 5-3805-248-23-1
WORKLIGHT, HIGH BEAM, LOW BEAM AND BACKUP ALARM/HORN
RELAYS REPLACEMENT - CONTINUED
0078 00
INSTALLATION
1.
Position relay (4) on mounting surface and align holes.
2.
Install two washers (3) and bolts (2).
3.
Connect four wire connectors (1).
HIGH BEAM
LOW BEAM
2,3
1
RELAY
RELAY
4
BACKUP ALARM HORN RELAY
WORKLIGHT RELAY
4.
END OF WORK PACKAGE
0078 00-2