TM 5-3805-248-23-1
FINAL DRIVE MAINTENANCE - CONTINUED
0143 00
INSTALLATION - CONTINUED
4.
Install 22 washers (6) and nuts (5). Torque nuts (5) in
8
5,6
7
criss-cross pattern to 265 lb-ft (359 Nm).
394-280
5.
6.
Refill final drive. Refer to Drain and Refill, steps 4 through 6, in this work package.
END OF WORK PACKAGE
0143 00-6