TM 5-3805-248-23-2
SHIFT POINT ADJUSTMENT - CONTINUED
0285 00
ADJUSTMENT - CONTINUED
8.
Remove four plugs (4) at taps A, B, C and D.
9.
Install transmission hydraulic test group at taps A, B, C and D.
10.
Remove four plugs (3) at taps E, F, G and H.
11.
Operate engine and let transmission oil get to normal operating temperature (TM 5-3805-248-10).
12.
Put transmission selector lever, at operator console, in 2nd speed position and run engine at 1,500 RPM.
13.
Check supply oil to governor at test location A. Pressure should be 85-94 psi.
14.
If supply pressure for governor is not in tolerance, turn adjustment screw (E) to get correct pressure.
E
F
G
H
3
4
A
D
BC
394-832
0285 00-4