TM 5-3805-248-23-2
CONTROL LEVER LINKAGE REPLACEMENT - CONTINUED
0325 00
REMOVAL - CONTINUED
NOTE
Steps 21 through 32 are the procedure for removal of remaining segment of bowl lever linkage.
21.
Remove nut (41) and rod (37) from connecting link
(35).
22.
Remove bolt (39), rod (40) assembly and two washers
37
(38).
23.
Remove bearing (42).
35
38
39
42
41
40
394-1070
24.
Loosen two nuts (44) on each end of rod (40).
43
25.
Remove two rod ends (43) and nuts (44) from rod
(40).
44
40
44
43
394-1071
0325 00-5