TM 5-3805-260-24
DRAFT FRAME
4.
Install bolts (2) to support assembly (3) on the
top of draft frame. Install bands that hold fuel
line and electrical cable to the draft frame.
5.
Connect four hoses (4) at the top of the draft
frame.
6.
Fasten a hoist to and lift the bowl lift cylinders
into position. Install pins (5), bars (6) and bolts to
hold the bowl lift cylinders. Connect hoses (7),
(8) and (9) to the cylinders.
7.
Connect hoses (10), (11) and (12) on the left
side of the bowl.
end by:
a)
connection of tractor and scraper
4-80