EJECTOR REAR GUIDE ROLLER
4.
Install ring (4) in the groove in roller to hold the
bearing in place.
5.
Install key (5) in the groove on the shaft.
6.
Put roller(l) in position on the ejector and install
nut (6). Tighten the nut to a torque of 450 - 70
lb.ft. (610 + 95 N.m).
7.
Use the hoist and move the ejector backward so
that guide rollers slide into position in the track.
8.
Put the rod end of the ejector cylinder in position
and install pin (7), plate and bolts.
9.
Install the rear cover assembly, see INSTALL
EJECTOR CYLINDER for this operation.
4-162