• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEADLIGHT ASSEMBLY REPLACEMENT
HEADLIGHT PLATE SPACER, LIGHT LENS, AND GASKET REPLACEMENT

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  98    99    100    101    102  103  104    105    106    107    108  
img
.
TM 5-2350-377-13&P
0030
INSTALLATION
1.
Install connector (Figure 2, Item 9) on headlight (Figure 2, Item 1).
2.
Align four holes (Figure 2, Item 5) in headlight (Figure 2, Item 1) with holes (Figure 2, Item 8) on apron
(Figure 2, Item 6). Make sure cable (Figure 2, Item 7) is in groove in headlight (Figure 2, Item 1).
3.
Attach headlight (Figure 2, Item 1) with four bolts (Figure 2, Item 2), washers (Figure 2, Item 3), and flat washers
(Figure 2, Item 4) to apron (Figure 2, Item 6). Torque screws between 40 to 45 lb-ft (54 to 65 Nm).
1
2
3
4
5
9
8
6
7
M0004HBF
Figure 2. Headlight Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect negative battery cable (TM 5-2350-262-20).
2.
Unblock front of vehicle (TM 5-2350-262-20).
END OF TASK
END OF WORK PACKAGE
0030-2
03/15/2011Rel(1.8)root(maintwp)wpno(M00003)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.