TM 5-2350-377-13&P
0039
INSTALLATION
1.
Flow valve installation:
a.
Install two flow valves (Figure 3, Item 4) to valve bodies (Figure 3, Item 5).
b.
Secure two flow valve bodies (Figure 3, Item 4) with screw (Figure 3, Item 1), two flat washers
(Figure 3, Item 2), and nut (Figure 3, Item 7) to bracket (Figure 3, Item 6).
c.
Secure two pins (Figure 3, Item 3) on either side of valve bodies (Figure 3, Item 5).
2.
Holding valve installation:
a.
Install two valves (Figure 3, Item 12) next to port 4 on valve bodies (Figure 3, Item 8).
b.
Install two check valves (Figure 3, Item 11) next to valves (Figure 3, Item 12) on valve bodies
(Figure 3, Item 8).
c.
Secure two valve bodies (Figure 3, Item 8) with two screws (Figure 3, Item 1), four flat washers
(Figure 3, Item 2), two new lockwashers (Figure 3, Item 10), and nuts (Figure 3, Item 7) to bracket
(Figure 3, Item 9).
3
1
1
2
1
12
2
11
2
4
5
6
12
8
5
11
9
2
7
8
2
10
10
7
7
M0055HBF
Figure 3.
Flow Valves Installation.
END OF TASK