TM 5-3800-205-23-1
FINAL DRIVE MAINTENANCE
THIS WORK PACKAGE COVERS
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
Materials/Parts
Maintenance Level
Unit
Cleaning compound, solvent (Item 6, WP 0171
Tools and Special Tools
Tool kit, general mechanic's (Item 33, WP 0172
O-ring
Shop equipment, common no. 1 (Item 24, WP
Personnel Required
Two
Equipment Condition
NOTE
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance,
testing, adjusting and repair of the machine. Be prepared to collect fluid with suitable containers before
opening any compartment or disassembling any component containing fluids.
Dispose of all fluids according to local regulations and mandates.