TM 5-3800-205-23-2
SLIDING FLOOR LINK REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Equipment Condition
Maintenance Level
Machine parked on hard, level surface (TM 5-3800-
Direct Support
205-10-1)
Tools and Special Tools
Scraper bowl lowered to ground (TM 5-3800-205-
10-1)
Shop equipment, field automotive (Item 23, WP
Parking brake applied (TM 5-3800-205-10-1)
Wheels chocked (TM 5-3800-205-10-1)
Battery disconnect switch in OFF position (TM 5-
3800-205-10-1)
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable lift capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in death or injury to
personnel.
NOTE
Link assembly weighs 100 lb (45 kg).
1.
Position floor jack under link assembly (1) and
2
1
remove two bolts (2), bar (3) and pin assembly (4).
Lower link assembly (1) to ground.
3
390-828
4