• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Intermediate Headlight Wiring Harness Removal.
APRON AND DOZER ASSEMBLY REPLACEMENT AND REPAIR - Continued

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  117    118    119    120    121  122  123    124    125    126    127  
img
.
TM 5-2350-377-13&P
0036
REMOVAL - Continued
5.
Remove locknut (Figure 5, Item 4), screw (Figure 5, Item 2), and pivot pin (Figure 5, Item 3) from each side of
vehicle. Discard locknuts.
WARNING
Personnel must stand clear during lifting operations. A swinging or shifting load may result
in injury to personnel.
6.
Lift apron and dozer assembly (Figure 5, Item 1) up and away from vehicle. Place apron and dozer assembly
(Figure 5, Item 1) on blocks on level surface.
1
2
3
4
M0023HBF
Figure 5. Lifting Apron and Dozer Assembly Removal.
END OF TASK
0036-5
03/15/2011Rel(1.8)root(maintwp)wpno(M00009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.