• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Blade Removal.
Figure 5. Lifting Apron and Dozer Assembly Removal.

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  116    117    118    119    120  121  122    123    124    125    126  
img
.
TM 5-2350-377-13&P
0036
REMOVAL - Continued
3.
Support apron hydraulic cylinders (Figure 3, Item 2) with blocks, and remove screw (Figure 3, Item 1), nut
(Figure 3, Item 4), two washers (Figure 3, Item 5), and pin (Figure 3, Item 3) from each side of vehicle.
2
1
5
4
3
M0021HBF
Figure 3. Hydraulic Cylinders Removal.
4.
Disconnect headlight intermediate wiring harness cannon plug (Figure 4, Item 2) from apron wiring harness
receptacle (Figure 4, Item 1) on left side of vehicle.
2
1
M0022HBF
Figure 4.
Intermediate Headlight Wiring Harness Removal.
0036-4
03/15/2011Rel(1.8)root(maintwp)wpno(M00009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.