• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Support Blocks Removal.
Figure 4. Intermediate Headlight Wiring Harness Removal.

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  115    116    117    118    119  120  121    122    123    124    125  
img
.
TM 5-2350-377-13&P
0036
REMOVAL - Continued
WARNING
Do not lift apron and dozer assembly with dozer blade installed unless dozer lockpins are
installed. Failure to comply may result in severe injury or death to personnel.
NOTE
Ensure lower apron lockpins are in the stowed position.
2.
If dozer blade (Figure 2, Item 1) has not been removed, connect a chain between lifting device and shackle
(Figure 2, Item 2) at back side of dozer blade (Figure 2, Item 1). Tighten chain enough to remove slack.
1
2
M0020HBF
Figure 2.
Blade Removal.
0036-3
03/15/2011Rel(1.8)root(maintwp)wpno(M00009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.