• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Outer Pivot Pins Removal.
Figure 5. Pivot Points Installation.

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  139    140    141    142    143  144  145    146    147    148    149  
img
.
TM 5-2350-377-13&P
0037
DISASSEMBLY
1.
Remove four screws (Figure 3, Item 3), lockwashers (Figure 3, Item 2), and shackle (Figure 3, Item 4) from
dozer blade (Figure 3, Item 5). Discard lockwashers.
2.
Using hammer and soft drift, drive out eight bushings (Figure 3, Item 1) from inner and outer pivot points of
dozer blade (Figure 3, Item 5).
1
1
1
1
2
3
4
5
M0046HBF
Figure 3.
Shackle and Dozer Blade Disassembly.
END OF TASK
ASSEMBLY
1.
Install eight bushings (Figure 4, Item 1) on inner and outer pivot points of dozer blade (Figure 4, Item 5).
2.
Install shackle (Figure 4, Item 4) on dozer blade (Figure 4, Item 5) with four new lockwashers
(Figure 4, Item 2) and screws (Figure 4, Item 3).
1
1
1
1
2
3
5
4
M0047HBF
Figure 4.
Shackle and Dozer Blade Assembly.
END OF TASK
0037-3
03/15/2011Rel(1.8)root(maintwp)wpno(M00010)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.