• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Dozer Blade Installation.
Figure 9. Inner Pivot Pins Installation.

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  142    143    144    145    146  147  148    149    150    151    152  
img
.
TM 5-2350-377-13&P
0037
INSTALLATION - Continued
6.
Retract ejector (Figure 8, Item 2) until dozer blade (Figure 8, Item 4) is folded against apron (Figure 8, Item 3).
7.
Install pin assembly (Figure 8, Item 8) and latch (Figure 8, Item 1) on each side of apron (Figure 8, Item 3) and
dozer blade (Figure 8, Item 4).
8.
Install two washers (Figure 8, Item 7) and screws (Figure 8, Item 6) on dozer blade (Figure 8, Item 4) and outer
pivot pins (Figure 8, Item 5).
1
8
2
3
4
5
7
6
M0051HBF
Figure 8.
Dozer Blade and Pin Assembly Installation.
0037-6
03/15/2011Rel(1.8)root(maintwp)wpno(M00010)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.