TM 5-2350-377-13&P
0037
INSTALLATION - Continued
3.
Coat two outer pivot pins (Figure 6, Item 2) with grease and install dozer blade (Figure 6, Item 3) on apron
(Figure 6, Item 1) with outer pivot pins (Figure 6, Item 2).
4.
Remove lifting device and chain.
1
2
3
M0049HBF
Figure 6.
Dozer Blade Installation.
5.
Move ejector (Figure 7, Item 2) forward, and connect chain (Figure 7, Item 1) between shackle
(Figure 7, Item 4) and eye (Figure 7, Item 3) on ejector (Figure 7, Item 2).
1
2
3
4
M0050HBF
Figure 7. Chain Connection.
03/15/2011Rel(1.8)root(maintwp)wpno(M00010)