• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Pivot Points Installation.
Figure 8. Dozer Blade and Pin Assembly Installation.

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  141    142    143    144    145  146  147    148    149    150    151  
img
.
TM 5-2350-377-13&P
0037
INSTALLATION - Continued
3.
Coat two outer pivot pins (Figure 6, Item 2) with grease and install dozer blade (Figure 6, Item 3) on apron
(Figure 6, Item 1) with outer pivot pins (Figure 6, Item 2).
4.
Remove lifting device and chain.
1
2
3
M0049HBF
Figure 6.
Dozer Blade Installation.
5.
Move ejector (Figure 7, Item 2) forward, and connect chain (Figure 7, Item 1) between shackle
(Figure 7, Item 4) and eye (Figure 7, Item 3) on ejector (Figure 7, Item 2).
1
2
3
4
M0050HBF
Figure 7. Chain Connection.
0037-5
03/15/2011Rel(1.8)root(maintwp)wpno(M00010)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.