TM 5-3800-205-23-2
ELEVATOR FLIGHTS AND CHAINS REPLACEMENT - CONTINUED
0023 00
REMOVAL - CONTINUED
4.
Attach ratchet strap, two nylon straps and a suitable lifting device to flights (2).
5.
Attach a suitable clamp one full link above and one full link below master link (3).
6.
Remove two lock pins (10), plate (8), two spacers (9), and master link (3).
2
9
8
390-778
390-779
3
10
7.
Slowly remove clamp from chain (1).
8.
Repeat steps 5 through 7 for other side.
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Failure to follow this warning may result in injury to personnel.
9.
Release tension on lifting device to ease removal of chain (1) and flights (2) from elevator. Carefully remove move
chain and flights from elevator.
1
2
1
390-780
390-781
0023 00-2