TM 5-3800-205-23-2
ELEVATOR FLIGHTS AND CHAINS REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Maintenance Level
Personnel Required
Unit
Two
Tools and Special Tools
References
Shop equipment, common no. 1 (Item 24, WP 0048
Equipment Condition
REMOVAL
NOTE
Master link is an offset link. There is one master link on each chain.
1.
Rotate chain (1) and flights (2) until master link (3) is in front of scraper bowl. Position wood blocks under chain and
flights.
2.
Attach a nylon strap and suitable lifting device to flights (2) and chain (1).
3.
Remove bolt (4) from bracket (5) and lower elevator chain adjustment roller (7) against elevator (6). Repeat step for
other side. Remove lifting device and nylon strap from flights (2) and chain (1).
3
5
2
1
4
390-776
390-777
WOOD
7
6
BLOCKS