TM 5-3805-248-23-1
HOSES (WITH CROSSOVER TUBE), LINES AND FITTINGS TO BOWL
CYLINDERS REPLACEMENT - CONTINUED
0238 00
INSTALLATION - CONTINUED
3.
Position bowl cylinder rod eye in mounting bracket and install pin (22).
4.
Install pin assembly (21) and bolt (20).
21
20
22
394-555
5.
Install right side draft frame tube assembly on tube assembly (15) (WP 0236 00).
6.
Install new preformed packing (17) in hose assembly
7,8 (HIDDEN)
1,2
(10).
5,6
(HIDDEN) 3,4
11,12 (HIDDEN)
9
10
7.
Position hose assembly (10) and two flange halves
(16) on tube assembly (15).
8.
Install four washers (19) and capscrews (18).
9.
Install new preformed packing (12) in hose assembly
(9).
10.
Position hose assembly (9) and two flange halves (11)
on tube assembly (15).
11.
Install four washers (14) and capscrews (13).
12.
Install new preformed packing (8) on hose assembly
(9).
13.
Connect hose assembly (9) and two flange halves (7)
at top of bowl cylinder.
14.
Install four washers (6) and capscrews (5).
15.
Install new preformed packing (2) on hose assembly
(10).
13,14
15
18,19
16,17
DRAFT FRAME
16.
Connect hose assembly (10) and two flange halves (1)
(HIDDEN)
at top of bowl cylinder.
HOSE ASSEMBLY
394-544
17.
Install four washers (4) and capscrews (3).
18.
Fill hydraulic tank to correct level (TM 5-3805-248-10).
0238 00-5