Figure 4. Valve Solenoid.
Figure 6. Control Box Connectors J-1 and J-2.

Maintenance Manual For The Hydraulic Blade Folder-Track Tensioner For Armored Combat Earthmover, M9
Page Navigation
  36    37    38    39    40  41  42    43    44    45    46  
img
. .
TM 5-2350-377-13&P
0012
ELECTRICAL SYSTEM - Continued
STEP
7.
Check control box for continuity.
a.
Remove connector J-1 (Figure 5, Item 3) and connector J-2 (Figure 5, Item 2) from each end on control
box (Figure 5, Item 1).
b.
Check continuity between connector pins on connectors J1 (Figure 5, Item 3) and J2 (Figure 5, Item 2).
2
1
3
T00405HBF
Figure 5. Control Box.
c.
Refer to Tables 2 through 5 for lead locations.
Table 2. Control Box Connector Pins.
POSITIVE LEAD
NEGATIVE LEAD
J-1 (3)
J-2 (2)
J-1 (3)
J-2 (2)
C
D
L
E
M
A
C
L
M
CONDITION/INDICATION
Is continuity present across control box?
DECISION
YES - If continuity is indicated, go to Step (8).
NO - If an open circuit is indicated, replace control box wiring harness (WP 0027). Verify problem is solved.